Everyone completes all ten competencies. Pick the role that matches your layer, follow that route — it tells you where to push to Advanced and what your capstone deliverable is.
RolesBackend · Frontend · QA · Lead
TypeElective route
SectionBootcamp 2026
01 — who this is for
For API, data, and business-logic work
You build the engine: endpoints, schemas, and the rules behind them.
Lean into planning tickets, building in slices, and testing hard. Your correctness bar is high because the frontend and other services trust your contracts.
02 — your route
How to work the 10 competencies for this role
Everyone completes all ten — this is where to put your energy and which tier to push to.
Competency
Your focus
Push to
3 · Planning
Decompose into API + data tickets; define contracts
Advanced
5 · Feature Development
Build endpoints/services in verified slices
Advanced
7 · Testing
Unit + integration; edge cases on inputs & state
Advanced
9 · Code Review
Correctness, security, data integrity
Advanced
1,4,6,8,10
Prompts, designing, refactoring, docs, team workflow
You own the engine of the Leave Management System: the request lifecycle, the balance ledger, and the validation rules behind all 9 acceptance criteria. Everyone still ships the same Must slice — your path says where you go deep.
Your layer owns: API contract design, balance calculation (approval decrements, rejection does not), date-range validation (AC3), shortfall error messaging (AC4), queue isolation rules (AC5), and terminal-state guard (AC8). Go deep on Planning (comp. 3), Feature Development (comp. 5), Testing (comp. 7), and Code Review (comp. 9).
Role capstone · OpenProject: Leave Management System
Design & build a backend slice
Objective: plan, build, and test one API feature with its data model and business rules, reviewed to a mergeable state.
Model the data + endpoints for one feature; write the tickets.
Implement in slices with tests for the rules and edge cases.
Review for correctness, security, and data integrity.
✓
Done when
A tested, reviewed API feature with a sound data model.
✗
Watch out
Skipping edge-case tests on state transitions — that's where backend bugs hide.
Discuss with your facilitator: which business rule was hardest to express, and how did you verify it?
01 — who this is for
For UI, components, and design-to-code work
You build what users touch: screens, components, and flows.
Prompt engineering and the design setup pay off most for you, plus refactoring to keep components clean and docs so others can reuse them.
02 — your route
How to work the 10 competencies for this role
Everyone completes all ten — this is where to put your energy and which tier to push to.
You own what users touch in the Leave Management System: the submission form, the manager's approval queue, the balance display, and the history list. Everyone still ships the same Must slice — your path says where you go deep.
Your layer owns: the "acting as" switcher UI (AC1), the leave request form with date validation feedback (AC2, AC3), the manager queue with approve/reject controls (AC5, AC6, AC7), the balance ledger display, and the filterable history view (AC9). Go deep on Prompt Engineering (comp. 1), Designing (comp. 4), Feature Development (comp. 5), and Refactoring (comp. 6).
Role capstone · OpenProject: Leave Management System
Build a polished UI flow
Objective: take one screen/flow from design to a working, reviewed component that matches the design and handles empty/error states.
Set up the design/flow and map screens to tickets.
Build the components in slices; handle loading/empty/error.
Refactor for reuse; review for accessibility & pattern fit.
✓
Done when
A working UI flow that matches the design and handles edge states.
✗
Watch out
Happy-path-only UI — empty and error states are part of "done".
Discuss with your facilitator: where did the design and the built component drift, and why?
01 — who this is for
For testing, quality, and process work
You protect quality: coverage, edge cases, and the process that catches issues early.
Testing and code review are your core; the ticket pipeline and Odoo board setup make your process repeatable. Your superpower is asking Claude "what am I missing?"
02 — your route
How to work the 10 competencies for this role
Everyone completes all ten — this is where to put your energy and which tier to push to.
New this cycle — work these too:integration testing with Playwright MCP, Chrome DevTools MCP, and Vite — drive real end-to-end flows and read console/network output (see also FE → MCP Integration); and a project-specific debug skill to make bug reproduction & regression-testing repeatable.
03 — your layer
Acceptance-test suite, edge-case hunt, and ticket intake
You own quality for the Leave Management System: write the test suite against the 9 acceptance criteria, hunt the edge cases your teammates missed, and intake bugs into the board via Odoo MCP. Everyone still ships the same Must slice — your path says where you go deep.
Your layer owns: the full test suite covering all 9 ACs — especially the negative cases (AC3 invalid dates, AC4 balance exceeded, AC8 terminal state), the ticket breakdown and board setup (Odoo MCP), and the review checklist your team uses. Go deep on Testing (comp. 7), Code Review (comp. 9), and Planning (comp. 3).
Role capstone · OpenProject: Leave Management System
Build a test-first feature & a review gate
Objective: take one feature test-first, cover its edge cases, and define a repeatable review checklist for the team.
Break the feature into tickets on the board (Odoo MCP).
Write tests first (happy path + edge cases), then make them pass.
Author a review checklist and run it on the result.
✓
Done when
A test-covered feature plus a reusable review checklist.
✗
Watch out
Testing only the happy path — the edge cases are the job.
Discuss with your facilitator: which edge case would have shipped as a bug without your tests?
01 — who this is for
For planning, standards, and adoption
You turn requirements into plans and turn AI use into a team standard — and you become the AI champion for your team.
Planning, code review, and team workflow are your core. Your job after the bootcamp is to mentor others and measure adoption, not just build.
02 — your route
How to work the 10 competencies for this role
Everyone completes all ten — this is where to put your energy and which tier to push to.
Competency
Your focus
Push to
3 · Planning
Requirements → plan, decomposition, estimation
Advanced
9 · Code Review
Set the review bar & checklist for the team
Advanced
10 · Team Workflow
Reusable prompts, CLAUDE.md, rollout
Advanced
1,2,4,5,6,7,8
The build competencies — enough to lead credibly
Intermediate
New this cycle — work these too: the Project Initiator skill chain is your kickoff superpower — it authors the SRS / PRD / system design (and a backlog + estimates) before Planning starts, converting fuzzy client input into review-ready deliverables. See also the idea → spec slide in Planning.
03 — your layer
Process assets — CLAUDE.md, skills, and rollout
The project is the Leave Management System; your deliverable is a repeatable team workflow built around it. Everyone still ships the same Must slice — your path says where you go deep.
Your layer owns: a CLAUDE.md that encodes how your team builds the Leave Management System, one reusable skill, a review checklist, and a rollout plan your team can adopt. Go deep on Planning (comp. 3), Code Review (comp. 9), and Team Workflow (comp. 10).
Role capstone · OpenDeliverable: a team AI workflow
Stand up your team's way of working
Objective: produce the standards + assets your team will actually use — project instructions, a reusable skill, a review checklist, and a rollout plan.
Write/extend a CLAUDE.md that encodes how your team builds.
Package one reusable skill + a shared review checklist.
Draft a rollout plan and how you'll measure adoption (e.g. a BUILD_METRICS-style view).
✓
Done when
A documented workflow + standards another team member can adopt unaided.
✗
Watch out
A plan only you understand — adoption fails without shareable assets.
Discuss with your facilitator: what is the first standard you'll roll out, and how will you know it stuck?